Unofficial prototype by NovaHawk Labs, compiled from public NHDES and EPA records. Not an NHDES website. Covers 1191 projects, 2015 to 2026. How this was built

NH Water Infrastructure FundingProject-level funding by community, county and legislative district

Drinking water

Manchester Water WorksDrinking Water Infrastructure Construction

Manchester, Hillsborough County · Awarded in 2019

About this project

Manchester Water Works used the loan for improvements to the Lake Massabesic Dam, which impounds Lake Massabesic, the primary water supply for Manchester Water Works. The project included removing the existing concrete bridge piers from the spillway section; installation of collapsible flashboards designed for 50-year and 100-year storm events; raising the left dam embankment, earthen dikes, and gatehouse wing walls to achieve 1-foot of freeboard during the spillway design flood; and resurfacing an 800-foot section of Lake Shore Road to withstand overtopping and protect against scour and erosion. Project type: General Infrastructure Upgrade.

Location