Pennichuck East UtilityDrinking Water Infrastructure Construction

Litchfield, Hillsborough County · Awarded in 2017

About this project

Pennichuck East Utility used the grant funds to connect the Litchfield distribution system to the Pennichuck Water Works main in Merrimack. The interconnection was installed between the Daniel Webster Highway on the west side of the Merrimack River and the Charles Bancroft Highway on the east side of the Merrimack River to support expansion of the Litchfield water system in response to private well contamination with PFAS. This project is part of a long-term supply strategy for the Pennichuck East Utility systems east of the Merrimack River with contamination issues. Project type: Address Contamination, Interconnection.