Planning and asset management
Town of MarlboroughOther - Planning and Assessments
Marlborough, Cheshire County · Approved August 30, 2024
About this project
This project is a continuation of the Planning & Evaluation Project completed July 2023. The project will allow for the revaluation of work done this far, with some rework to bring the upper bypass to final design and to develop 30% design phase engineering for the lower system. Considerations of both structural and non-structural stormwater control methods will be evaluated. During Phase 2 the intent is to evaluate green infrastructure opportunities in both the proposed project's upper and lower portions.