Unofficial prototype by NovaHawk Labs, compiled from public NHDES and EPA records. Not an NHDES website. Covers 1191 projects, 2015 to 2026. How this was built

NH Water Infrastructure FundingProject-level funding by community, county and legislative district

Drinking water

Bethlehem Village DistrictDrinking Water Infrastructure Construction

Bethlehem, Grafton County · Awarded in 2017

About this project

The Bethlehem Village District used the grant to install safety and operational improvements to the water treatment system to address issues with disinfection byproducts and replace old water meters in the distribution system. The Bethlehem Village District was having difficulty meeting disinfection byproducts limits for drinking water, specifically for total trihalomethanes and haloacetic acids. Installation of a new ultraviolet disinfection system allowed to bring disinfection byproducts to within regulatory limits. Project type: Address Contamination, Water Treatment, General Infrastructure Upgrade.

Location