City of BerlinCentralized Wastewater Treatment - Sewer System Rehabilitation

Berlin, Coos County · Approved May 7, 2025

About this project

The project includes the installation of one permanent force main bypass structure on the existing force main at the Watson Street Pump Station. The discharge force main and the CSO pipe will be replaced at the Watson Street Pump Station and a permanent bypass connection will be added at the headworks of the Water Pollution Control Facility.