City of RochesterCentralized Wastewater Treatment - Sewer System Rehabilitation

Rochester, Strafford County · Approved April 16, 2024

About this project

The project includes the installation of new submersible pumps in the existing wet well, construction of a new masonry block/brick fa e building and the subsequent reconnection to the existing force main. The new building will be located adjacent to the existing wet well and will house the standby power generator, electrical switch gear and controls.