Unofficial prototype by NovaHawk Labs, compiled from public NHDES and EPA records. Not an NHDES website. Covers 1191 projects, 2015 to 2026. How this was built

NH Water Infrastructure FundingProject-level funding by community, county and legislative district

Drinking water

Evergreen TerraceDrinking Water Infrastructure Construction

Lee, Strafford County · Awarded in 2020

About this project

Evergreen Terrace used the grant and loan to do system-wide improvements to address deficiencies with aging infrastructure. The project included installing 825 feet of new distribution piping, installed below the frost line, to address the chronic leaks and breaks the system has been experiencing from the pipes freezing. The project also included installation of new inline valves, individual curb-stops, blow-off hydrants, and upgrades to the wellhouse and arsenic treatment system. The old, abandoned well house was demolished and removed from the property. Project type: Address Contamination, Water Main Replacement, General Infrastructure Upgrade.

Location