About this project

The Hampstead Area Water Company used the grant for water system improvements necessitated by the Southern NH Regional Water Project to five towns in southern New Hampshire with MtBE contamination of their groundwater sources. The Hampstead Area Water Company constructed a new water storage tank and water main to connect to the existing distribution system in Atkinson. These improvements stabilized pressures in the southern part of the system, allowing supply wells to pump at a more constant, sustainable rate, reducing wear and tear on mechanical and electrical equipment. The new Atkinson water storage tank was also a critical piece of infrastructure in the Southern New Hampshire Regional Water Interconnection Project and enabled HAWC to supply public water to Plaistow and address methyl tertiary-butyl ether (MtBE) contamination in Plaistow's drinking water. Project type: Address Contamination, Storage Tank Upgrades.

Location