Drinking water
Jaffrey Water WorksDrinking Water Infrastructure Construction
Jaffrey, Cheshire County · Awarded in 2020
About this project
The Towns of Jaffrey and Peterborough jointly used the funding to develop the Cold Springs well site will to address supply deficiencies in both towns. Jaffrey was unable to meet daily demand with their largest source offline and withdrawal restrictions on their second source. The well supply in Peterborough had been off-line since 1982 due to industrial contamination. The project included purchase of the Cold Stone Springs property, development of a new well, construction of a water treatment facility, installation of raw water transmission mains from the new wells to the water treatment facility and connection of the treatment facility to the existing distribution system in Jaffrey, and an interconnection between the Town of Peterborough and Town of Jaffrey water systems. The Cold Springs well draws from an alternative aquifer, providing a more balanced water system and needed system redundancy that will meet supply needs of both towns. Project type: New Source, Water Treatment, Interconnection.