Unofficial prototype by NovaHawk Labs, built from public NHDES data. Not an NHDES website. Covers 159 ARPA-era projects, about 40% of the full program. How this was built

NH Water Infrastructure FundingWhere the money went, town by town

Drinking water

New Hampton Village Precinct

Drinking Water Infrastructure · New Hampton, Belknap County · Approved October 4, 2022

poster that says "drinking water infrastructure"
Photo: NH Department of Environmental Services

About this project

Total project cost: $240,000 ARPA Grant: $150,000 DWSRF Loan: $90,000 Approved: October 4, 2022 The New Hampton Village Precinct will use the American Rescue Plan Act (ARPA) grant funds for improvements to the existing treatment system to address the elevated levels of disinfection byproducts (DBPs) and improve corrosion control. The treatment modifications will include filter media replacement for the existing 2-stage filtration process, plumbing modifications, installation of a coagulant feed system, filter valve replacement and interface with SCADA, and additional treatment plant interior modifications to accommodate the treatment improvements. All work will take place within the existing treatment facility building. Grant funds will be used in conjunction with NH Drinking Water State Revolving Fund (DWSRF) loan funds to complete the engineering, design, bidding, and construction for the project.

Location