North Conway Water PrecinctOther - Planning and Assessments

Conway, Carroll County · Approved April 12, 2023

About this project

The project involves further evaluation of alternatives that were developed in the Phase 1 study including the selected feasible alternatives, public education and outreach, selection of a preferred alternative, final design and engineering of the preferred alternative, and preparation of required permit applications and bid documents. The goal of the project is to prevent the Saco River from further eroding the banks which are causing bank instability and posing a risk to the WWTF.