Merrimack Village DistrictDrinking Water Infrastructure Construction

Merrimack, Hillsborough County · Awarded in 2017

About this project

The Merrimack Village District used the funding to construct a new booster pump station at the Turkey Hill location that was in need of replacement due to aging infrastructure, maintenance accessibility, and limited station functionality. The new booster pump station was installed above grade with walk-in access for operation and maintenance activities and included a pre-fabricated pump system including piping, valves, and pumps to maintain existing capacity. Additional station improvements included an outdoor generator for backup power and a designated space for a future chemical feed system. Project type: General Infrastructure Upgrade.