Town Line Village CooperativeDrinking Water Infrastructure Construction

Holderness, Grafton County · Awarded in 2021

About this project

Town Line Village Cooperative used the funding to make improvements to their aging distribution system that was in very poor condition, experienced frequent leaks, lacked isolation valves, and had a confined space deficiency with the well house. The project replaced approximately 3,500 feet of the old distribution system and installed service connections to each manufactured home with individual curb stops. The project also included installation of inline valves with blow-off hydrants to properly flush and isolate the system and construction of a new well house building with booster pumps powered by energy efficient Variable Frequency Drives. Project type: Water Main Replacement, General Infrastructure Upgrade.

Location