Town of ExeterCentralized Wastewater Treatment - Sewer System Rehabilitation

Exeter, Rockingham County · Approved March 3, 2025

About this project

The project consists of designing and constructing an additional sewage siphon barrel to improve the capacity of existing sewage siphon located under the Squamscott River that transports sewage from the Portsmouth Avenue and Jady Hill Avenue areas to the Main Pump Station. The existing sewer siphons are undersized for new connections or during extreme wet weather events, as confirmed through historic sanitary sewer overflows (SSOs) reported immediately upstream of the siphons at Duck Point located at the bottom of Jady Hill Avenue. Increasing sewer siphon pipe capacity will reduce the risk of future SSOs and allow for improvements to be made to sewer infrastructure, located upstream of the siphon pipes. In addition, the scope of this project will also consist of designing the rehabilitation of the Webster Avenue Pump Station and its connecting force main along Webster Avenue, Douglass Way, and Jady Hill Avenue. The pump stations small wet well and potential issues with pump cavitation, as well as developmental growth along Portsmouth Avenue, have contributed to capacity concerns at the pump station that warrant improvements to handle current and future flows.

Location