Town of HooksettCentralized Wastewater Treatment - New Collector Sewers

Hooksett, Merrimack County · Approved February 5, 2025

About this project

The purpose of the project is to replace the existing force main that serves the Pump Station. The existing 60-year-old cast iron force main is over 8,000 feet long and is too small to accommodate the sewer subbasin it serves which includes Southern New Hampshire University (SNHU). A new 4,000-foot-long gravity main and 4,000-foot-long force main will be constructed to get the wastewater to the existing collection system where the old force main currently connects.