Town of MilfordWastewater Infrastructure Improvements

Milford, Hillsborough County · Approved June 29, 2022

About this project

Total Project Cost: $390,000 ARPA Grant: $117,000 CWSRF Loan: $273,000 Approved: June 29, 2022 CWSRF Loan ($273,000) and ARPA Grant ($117,000) will be used to construct a conveyor system and a small building foundation addition and an overhead canopy at grade to transport screenings at the lowest level of the influent pump station building to the surface under the canopy and into a dumpster for easy removal.