Flood resilience

Town of Plymouth

Critical Flood Resiliency Infrastructure · Plymouth, Grafton County · Approved December 21, 2022

poster that says "critical flood resiliency infrastructure"
Photo: NH Department of Environmental Services

About this project

ARPA Grant: $51,893 Approved: December 21, 2022 ARPA funding will be used to support final design and permitting for the replacement of a 6’ round corrugated metal pipe with a 10’x6’ pre-cast concrete box culvert. The Town’s 2021 Hazard Mitigation Plan and 2018 Master Plan both identify replacement of the Loon Lake Road culvert as a top priority. When Loon Lake Road is closed due to flooding, access to over three miles of town roads is completely cutoff.