Town of SalemDrinking Water Infrastructure- Southern NH Region Water Connection

Salem, Rockingham County · Awarded in 2019

About this project

The Town of Salem used the grant for water system improvements necessitated by the Southern NH Regional Water Project to extend public water to five towns in southern New Hampshire with MtBE contamination of their groundwater sources. The funding was used to construct new water transmission mains and associated facilities required to connect properties in Windham impacted by MtBE, Salem's water system, and the Hampstead Area Water Company water system to the regional supply and ultimately to transmit water to Plaistow. The project included installation of 16,000 feet of water main along Route 28 from the Derry-Windham town line to the Salem water system; new meter stations with pressure reducing valves and chemical feed systems; 4,000 feet of 12-inch water main to connect the Salem water system to the Hampstead Area Water Company system in Atkinson; and 4,500 feet of 12-inch water transmission main along Route 111 in Windham. Project type: Address Contamination, Interconnection, Water main Extension.

Location