Drinking water

Town of SunapeeTreatment

Sunapee, Sullivan County · Approved December 2, 2020

About this project

Design of a UV system including: Demolition and removal of existing piping and valves, New piping and valves, New Ultra-Violet Light (UV) disinfection system, New flow meters, electrical panels, and phase converter required to run the UV system, Relocation of existing flow meters, electrical panels, and plant water system to accommodate new UV system equipment, and New filter effluent control valves and instrumentation and control system integration.