Unofficial prototype by NovaHawk Labs, compiled from public NHDES and EPA records. Not an NHDES website. Covers 1191 projects, 2015 to 2026. How this was built

NH Water Infrastructure FundingProject-level funding by community, county and legislative district

Drinking water

Waterville Acres Condominium AssociatesTransmission & Distribution

Holderness, Grafton County · Approved October 21, 2020

About this project

The improvements include construction of a new pump station; installation of a new storage tank; installation of a new variable speed booster pump and control panel; demolition of the existing pump station; and well replacement or rehabilitation of existing well if funding remains. The original water system infrastructure was installed in the 1970s and several major areas are in need of replacement. The pump station is a confined space entry, the tanks are badly rusted and in poor condition and the well is susceptible to surface water influence during periods of high water in the spring. Currently the system is chlorinating the water due to the surface water influence.

Location