City of DoverDrinking Water Infrastructure Construction

Dover, Strafford County · Awarded in 2017

About this project

The City of Dover used the grant funds to complete an interconnection with the City of Somersworth's drinking water system, which will act as an emergency supply for both systems in the event a well must be taken offline or other water system emergency. The project consisted of installing about 2,500 feet of watermain to connect the two systems, and constructing a metering building and control valve for flow from Somersworth to Dover and a pump system for flow from Dover to Somersworth. The City of Dover also constructed an aquifer recharge station in the Pudding Hill Aquifer to withdraw water from the Bellamy River and discharge to sand basins to recharge water supply wells. Project type: Interconnection.

Location