City of DoverStormwater - Green Infrastructure

Dover, Strafford County · Approved August 30, 2024

About this project

This phase is the continuation of two previous planning efforts and includes the acquisition of land needed to implement the stormwater treatment system at the Chapel Street Ravine. Utilizing Chapel Street Ravine for increased stormwater treatment throughout the city will result in a reduction of the volume of untreated discharges into the impaired Cocheco River. This will help reduce nutrient loads into the Cocheco River and in the Great Bay Estuary. Additionally, the project will advance the concept design to preliminary design.