Unofficial prototype by NovaHawk Labs, built from public NHDES data. Not an NHDES website. Covers 159 ARPA-era projects, about 40% of the full program. How this was built

NH Water Infrastructure FundingWhere the money went, town by town

Drinking water

Town of Seabrook

Wastewater System Improvement · Seabrook, Rockingham County · Approved July 27, 2022

illustration that says "Wastewater Infrastructure"
Photo: NH Department of Environmental Services

About this project

Total project cost: $2,644,000 ARPA Grant: $528,800 CWSRF Loan: $2,115,200 Approved: July 27, 2022 The Town of Seabrook will use the funding to make improvements to the wastewater treatment facility (WWTF) and the wastewater collection system. Proposed improvements may include replacement or rehabilitation components of the headworks WWTF, upgrades to pumps and their variable frequency drives (VFDs) at the facility, improvements to the belt filter press system, upgrades to the programmable logic controllers (PLCs) and Supervisory Control and Data Acquisition (SCADA) software, improvements to the Meter Vault at the WWTF and installation of radios and supporting hardware at pump stations and the WWTF.

Location